Public Works Complex, Master Plan and Phases I through III
- The Public Works Facility was too dated to properly accommodate its growing services and fleet of equipment
- DJG prepared a Master Plan for the 58-acre, non-contiguous Public Works Campus

- The Public Works Campus Master Plan included a complete narrative, a conceptual site plan with landscaping, architectural renditions, and cost scheduling scenarios
- The facility needed Animal Control, secured Police storage and impound lot, Divisions of Streets, Building and Grounds, and Sanitation, an expanded Fleet Maintenance Building, Equipment Parking, Administrative Offices, and on-site stormwater management
- DJG land use planners reconfigured the buildings on-site and organized them by like uses, which resulted in achieving a campus-like atmosphere, improving safety and maximizing efficiency
- Adaptive re-use was suggested where appropriate and new buildings were also proposed. DJG worked with Town staff to conduct a number of site visits, interviews, public presentations, and a workshop to develop the design scheme
- Following completion of the Master Plan, DJG was competitively selected to design Phases I, II and III. Phase I is currently under construction.